Guide

AI job shop scheduling: what it requires

If the schedule is fed “almost-right” data, it produces “almost-right” decisions — and the floor pays the price.

The minimum dataset that stabilizes decisions

You don’t need perfect data. You need the right data to be consistent and sequenced correctly — so daily release and dispatch decisions don’t change every time something unexpected happens.

This guide shows the minimum data you need, the sequence you can’t skip, and five checks before you trust any schedule output.

Snippet-ready answer: AI scheduling works when it’s anchored to reality: the true routing sequence, separated setup/run behavior, and visible queues by work center. Once those inputs are stable, the schedule becomes a decision system — what to release, what to protect, and what to delay — instead of a calendar that fails on the floor.

Sequence matters more than precision

The most common failure mode is skipping steps that “don’t feel like operations” — move, inspection, and real queue time. The sequence must reflect how work really flows: order entry → release → queue → setup → run → move → inspection → ship.

Reality check

If inspection is missing (or move time is ignored), the system will schedule “phantom capacity” and you’ll see on-time delivery slip without any obvious cause.

Five checks before you trust the output

  • Routings match real operation order (including inspection and move).
  • Setup and run time are separated and consistently measured.
  • Queues are tracked by work center (not averaged away).
  • Release rules exist and are followed (what enters WIP and when).
  • The constraint is identified and protected in daily decisions.